Robert Dallas
Robert started at DBD Limited in 2012 having graduated from Strathclyde University with a degree in Chemical and Process Engineering. In 2013 Robert joined one of the Legacy Ponds and Silos (LP&S) strategy and technical teams at Sellafield; developing the technical configuration baseline for the decommissioning of the Magnox Swarf Storage Silos (MSSS). Since then, in Robert’s time with DBD he has undertaken a number of projects in support of the Sellafield site and internationally on fusion and site decommissioning projects, travelling within Europe and Asia.
Robert has run the YGN’s “Intro to Nuclear New Build” Seminar in the past and more recently he was the sponsorship Co-Lead for both the YGN and ENYGF2017.